PLC Programming Tunnel Fire Alarm Monitoring System at Singapore LTA (2016)
PLC Programming on EHS Alarm Monitoring System at ST Marine, Singapore (2016)
PLC Programming on SKD Drawer VSD Gateway, Singapore (2016/17)
LV Air Circuit Breaker (ACB) replacement for Swanmet (M) Sdn Bhd Melaka (2009-February)
LV 415V OCEF Relay replacement for I.M.U (International Medical University Kuala Lumpur. (2008 – December)
LGAST Petronas Carigali, Labuan. (2008 – October / December)
Technical Support for LGAST Project 415V Gas (2sets) / Diesel (1 Set) Turbine (2500kW) at
SEG CSP-F3 Multi Function Relay replacement and Testing calibration works at Time Square Commercial Building, K.L. (2008 – August)
Supply Technical Personnel for Busbar – Busduct Installation work at Technip project Olefin Vietnam Quang Nai. (May – June 2008)
Project Commissioning / Supervision on 11.5kV-40MW Steam Turbine Generator at Sabah IPP-100 Kota Kinabalu. (2008 June)
Canon Machinery (M) Sdn Bhd Electrical Switchboard Cabling Works – Shah Alam. (2008 – May)
Technical Personnel for ABB Malaysia for solving defect works at Jimah Power Plant Sepang and Tuanku Jaafar Power Plant Phase II (PD2) Port Dickson. (April – June 2008)
Petronas Olefin MLNG Petronas Plant Bintulu 415V Generator and Normal Incomer closing control modification and testing works. (2008 May)
To supply Technical Personnel for Installation Supervision Works for ABB Malaysia at Doha Ras Laffan Qatar. (2008 April – June)
132kV Transformer Un-Tank for Inspection work and Insulation Oil Purification Works for MOX Bukit Rajah, Selangor. (2008 March)
Supply Electrical Technical Personnel for Sabah KK IPP-100 Generation Plant for Commissioning Works. (2008 March)
MG3 Melaka Petronas Refinery Extension Plant ABB REF542+ Relay Technical Support and Modification Works. (2008 March)
Protection Relay ABB INSUM Configuration and Technical Support at OPTIMAL Petronas Plant Paka. (2008 February)
11kV Chiller Board Protection Relay Retrofit Works for SFG (M) Sdn Bhd at Megamall K.L. (2008 January)
415V Technical Support / Troubleshooting at A.B.F Petronas Plant Bintulu. (2008 January)
Dung Quat Refinery, Vietnam (Petrovietnam) – Supply Technical Manpower (1 Person) for ABB Malaysia Commissioning Works (2007/08)
Mechanical Work of LV 415V Board Panel at Tangguh LNG Project – Indonesia BABO. (2007 Sept/Oct)
Pre-Commissioning Work and Calibration Works of 6.6kV VCU and 415V Starter Panels at CTOC Cakerawala Platform Petronas Carigali under Kencan Pinewell Sdn Bhd. (2007 August / September)
Protection Relay Calibration Works at CTOC – Cakerawala Platform Petronas Carigali under ABB. (2007 July / August)
Protection Relay Programming of Setting and Calibration Works for GE MM2 at CTOC Cakerawala Platform Petronas Carigali under Kencan Pinewell Sdn Bhd. (2007 June/July)
Protection Relay Technical Support on behalf of ABB Malaysia at Labuan Kikih SPA Offshore Platform. (2007 June/July)
Technical Support and Relay Calibration Works for ABB MNS02 INSUM Relays (under ABB contract) at Shell M3 Plateform Miri Sarawak. (2007 June / July)
Wisma Lim Foo Yong (Jone Lang Wootton ) Retrofit Relay Works for MSB. (Jan 2007)
3.3kV Load Shedding Control Retrofit Work at Talisman Offshore BR-A Plateform (Under ABB) (Feb 2007)
ABB MNS 415V Boards Diagnostics Testing on Live Circuits at BASF Plant, Gebeng kuantan. (Feb 2007)
Technical Support and Works Supervision at Belawan PLN Power Plant, Medan Indonesian. (March 2007)
SEG Under Voltage Relay Retrofit Work at Petronas Gas CUF Gurun Kedah. (April 2007)
Calibration of Frequency Relay on Change of Rate Feature at Ineax office Bkt Kemuning, Selangor for Brunei Shell Project II. (2007 May)
Protection Setting Study / Retrofit and Re Commissioning Testing Works of 6.6kV Motors for Gas Turbine at TNBG Paka, Terengganu. (Jan 2007)
ABB Subang – Tests of 415V ABB MNS Switchgears for Tg Bin Projects. (2006 February)
To supply and install completed with testing of Energy Meter at Mitsui Copper Foil (M) Sdn Bhd, Shah Alam. (2006 February)
Protection Relay Setting / Fault Calculation works for Western Digital at Thailand. (2006 February/ March)
Emergency Service at Mega Steel – LION Group Banting; Transformer 5kV/700Vac 825kVA HV flashover Tripping. (2006 March)
Calibration of Frequency Relay on Change of Rate Feature at Ineax office Bkt Kemuning, Selangor for Brunei Shell Project. (2006 March)
Emergency Service at Malex Inductries Product Sdn Bhd, Petaling Jaya; Transformer 1500kVA 11kV/433V Off Load Tap Changer Breakdown. (2006 April)
Protection Relays Setting Discrimination Studies Service of All 22kV System in Western Digital – Thailand Bangkok. (2006 April)
ABB Subang – Thailand Bangkok Western Digital Project 22kV Switchgear Factory Inspection and Testing Works (FAT). (2006 April / May)
Testing of 11.5kV ISO-Phase Busduct & High Rate Current Transformer in Generator Stator at Powertek Teluk Gong Melaka. (2006 May)
Project Supervision (11.5kV and 415V Scheme) at Sabah IPP-100 Kota Kinabalu. (2006 July / August)
11kV Incomers and Tie Interlocking and Intertripping Scheme modification and testing works at Main Intake S/S BP Chemical (M) Sdn Bhd, Gebeng Kuantan. (2006 Sept.)
11kV Main Busbar Differential Protection Scheme Testing and Trouble Shooting at BP Chemical (M) Sdn Bhd, Gebeng Kuantan. (2006 September)
Electrical Training Course for Western Digital (Thai) Co., Ltd, Bangkok, Thailand. (2006 September)
ABB MNS 380V LV Panel re-solved client defect at San Isidro Powertek, Quillota Chile. (2006 Oct / November).
DOLPHIN Energy, Qatar (DEL) – Supply Technical Manpower (6 Persons) for Qatar ABB Malaysia Project. (2006 – 2008 Contracts)
Emergency Breakdown Service at San Plastic Air Keroh Melaka on 11kV R.M.U Gears. (2006 Dec)
Emergency Transformer Breakdown Service at Grand Blue Wave Hotel. Shah Alam (2005 July)
Emergency Troubleshooting of 415V MSB on Earth Fault Tripping at Puteri Palma Condominium, IOI Resort, Puchong. (2005 August)
Supply and Install OCEF Protection Relay at 415V MSB Grand Bluewave Hotel, Shah Alam. (2005 November)
Protection Relay repair work for Grand Blue Wave Hotel, Shah Alam. (2005 December)
Supply and Install of OCEF Protection Relay at 415V MSB Seremban Parade, Seremban. (2005 December)
Supply & Install of Substation Battery completed with testing at WPJ002-Putrajay Precient No. 9 & Kota Damansara. (2005 December)
Troubleshooting Works- RED615 Line Different
Commissioning Test on 11kV Switchgear at TNB Substation (Jan 2019)
Commissioning Test on 11kV Switchgear at TNB Substation -Perak (March 2019)
Investigation of Transformer Humming Sound- Johor
Modification of MCC Compartment to ACB Compartment-Brunei Shell (2019)
Provide Man Services in Conducting Infrared Thermal Mapping-Bank Negara Malaysia-2019